Education in India: Annual Reports on the State of Education

From Indpaedia
Jump to: navigation, search

Hindi English French German Italian Portuguese Russian Spanish

Annual surveys of and reports about the status of education in India have been shifted to Education, annual reports on the status of: India


This is a collection of articles archived for the excellence of their content.



Contents

The status of school education in India

Rural schools: 2009-14

The Times of India

Rural schooling in India: Some facts

Jan 14 2015

Rural schools high on enrolment, but low on learning levels: Report

Akshaya Mukul

Pratham's 10th Annual Status of Education Report -the country's biggest private audit of elementary education in rural India -released Tuesday has a similar story as in previous years: rising enrolment, poor learning levels in reading, mathematics and English and growth in number of private schools. ASER also says improvement in school facilities -pupil teacher ratios, playgrounds, kitchen sheds, drinking water facilities, toilets -continues. HRD ministry is going to strongly dispute ASER's claims on falling learning outcomes since government's own report gives a different picture.

With Pratham gaining worldwide presence -from Pakistan to Africa -the ceremony , again like in the past, was a glittering event attended by industrialists, entrepreneurs and even chief economic advisor Arvind Subramanian. Report for 2014 done after survey of 16,497 villages, 5.7 lakh children in over 3.4 lakh households across 577 districts says that for the sixth year in a row enrolment levels are 96% or higher for the age group of 6 to 14.

Rural schools, 2014-16

Pratham audit paints mixed pic of rural education, Jan 19, 2017: The Times of India


A private audit of school education in rural India paints a mixed picture of hits and misses ­­ increase in enrolment, no increase in private school enrolment, improvement in reading ability and arithmetic, but not so much in reading English.

After a gap of a year, Pratham's 11th Annual Status of Education Report (ASER) was unveiled on Wednesday in the presence of Delhi education minister Manish Sisodia and chief economic adviser Arvind Subramaniam. The survey was carried out in 17,473 villages, covering 3,50,232 households. Children's attendance shows no major change since 2014. Also, the proportion of small schools in the government primary school sector continues to grow.

The report that largely looks at enrolment pattern and learning abilities highlights that at the all India level, enrolment in the age group of 614 has marginally increased from 96.7% in 2014 to 96.9% in 2016. Similar increase can be noticed in the enrolment for the age-group of 15-16 from 83.4% in 2014 to 84.7% in 2016.

In states like Madhya Pradesh, Chhattisgarh and UP, the fraction of out-of-school children has increased between 2014 and 2016. In MP, it has been the highest ­­ from 3.4% to 4.4%. In three states, the proportion of out-of-school girls is higher than 8%. This includes Rajasthan (9.7%), UP (9.9%) and MP (8.5%).

There has been no increase in enrolment in private schools in the last two years.Enrolment is almost unchanged at 30.8% in 2014 to 30.5% in 2016. Gender gap in private schools has decreased slightly from 7.6 percentage points to 6.9 percentage points.

As for learning ability , na tionally the proportion of children in Class III who could read at least Class I text has gone up slightly from 40.2% in 2014 to 42.5% in 2016. Overall, reading levels in Class V are almost the same year on year from 2011 to 2016. However, the proportion of children in Class V who could read a Class II-level text improved by more than five percentage points from 2014 to 2016 in Gujarat, Maharashtra, Tripura, Nagaland and Rajasthan.

However, in Class VIII, reading level has shown slight decline since 2014, from 74.1% to 73.1%. Except for Manipur, Rajasthan, Maharashtra and Tamil Nadu, reading level does not show much improvement.

In 2014, nationally 25.4% of Class III children could do a two-digit subtraction which has risen slightly to 27.7% in 2016, mainly in government schools. However, in Class V , the arithmetic levels of children measured by their ability to do simple division remained almost the same at 26%.But among Class VIII students, the ability to do division has continued to drop, a trend that began in 2010.

Ability to read English has slightly improved in Class III but relatively unchanged in Class V . In 2016, 32% children in Class III could read simple words as compared to 28.5% in 2009. Worrisome is the gradual decline in upper primary. In 2009, 60.2% in Class VIII could read simple sentences in English; in 2014, this was 46.7% and in 2016, it has declined to 45.2%.

2017, 2018

Ishita Bhatia & Ardhra Nair, Why parents prefer these govt schools to pvt ones, January 23, 2019: The Times of India

Kallapa Khindiwale at the zila parishad school in Chandar village in Pune district. The school had only one student when it was featured in TOI last year. That number has now gone up to six
From: Ishita Bhatia & Ardhra Nair, Why parents prefer these govt schools to pvt ones, January 23, 2019: The Times of India
Primary School-1 at Phaphunda in Meerut has an activity room with a projector
From: Ishita Bhatia & Ardhra Nair, Why parents prefer these govt schools to pvt ones, January 23, 2019: The Times of India


In The Absence Of Adequate Infrastructure, Some Rural Schools Are Making The Most Of What They Have, And Getting Results

The Annual Status of Education Report (ASER) paints a grim picture of senior school students who can’t do basic math and juniors who don’t recognise alphabets. But there are schools that have set a blazing example despite all the odds — inadequate infrastructure, shortage of teachers, poor mid-day meals. Innovative, courageous and inspiring teachers have at times made such a difference that parents are shifting their wards from private schools into these nononsense classrooms.

In UP, some of these exceptional schools are optimally utilising technology and have students who speak perfect English and score consistently well in exams. Like 10-year-old Aisha (who uses only her first name). She left a private school because her family did not want to spend “too much on the education of a girl”. While her brother, Taasim, continued to study in the earlier school, in 2017, Aisha was admitted in Class IV at the Primary School-I at Phaphunda village in Meerut. Soon, she started excelling in studies. Three months later, the school principal insisted that Aisha’s family conduct a competition between Aisha and her brother. Aisha fared better. Now Taasim is also studying in the same government school as his sister, in Class V.

At least 50 students from six private schools within a 6km radius of Phaphunda have taken admission in this government school in the last four years. So confident are school officials about ensuring quality that they have also instituted a ‘money-back policy’ for parents who are not satisfied with the performance of their wards. Enrolment has doubled from 190 in 2014. The school has an activity room with a projector, laptop and printer as well as colourful flex boards in classrooms.

At Primary English Model School in Kamalpur, Yatika Pundir, assistant teacher, said, “In 2015, our school was among the first two of Meerut district that were shortlisted to be converted into English-medium schools.” The challenge was to get rural students to switch to English education. The teacher achieved this through interactive activities that drew the children into the learning process.

But this is not the picture at all government schools in UP. One look at some of the schools lays bare the hurdles they face, struggling with teacher shortages, lack of basic facilities in classrooms, poor quality of mid-day meals and rickety buildings.

As UP schools make efforts to improve, far to the southwest, in Pune district of Maharashtra, Yuvraj Sangale is no longer India’s “loneliest school student”. He now has five classmates. The story of Yuvraj’s struggles and his teacher Rajinikanth Mendhe’s 40-km daily trek through hills and dirt tracks to reach him was read and shared online by many readers after it first appeared in TOI in March 2018. Yuvraj was then the only student of the zila parishad school in Chandar village of Bhor area in the district.

After readers came forward to arrange for supplies, from an electric water pump to bookshelves, a year on, this tiny settlement of 60 residents some 100 km from Pune, has a community hall, electricity supply for its school and new learning material. Yuvraj has a new teacher, too, replacing Mendhe. To reach Chandar village, Kallapa Khindiwale leaves home at Khanapur, 25 km from Pune, on Monday mornings with another teacher on a bike with groceries and books. He returns home only on Saturday morning.

“I don’t know how many of my students will study beyond Class IV or Class VIII. But I can make a difference to the first four years of their education. If I teach them right, they will learn to calculate wages, read boards of buses and buy things. They will not be cheated,” Khindiwale added.

This dogged pursuit of imparting education by teachers like Khindiwale is making an impact. ASER reveals an improvement in critical educational parameters in rural Maharashtra, now one of four states with a sustained and significant increase in learning outcomes after 2014 and an improvement of 3 percentage points or more in both 2016 and 2018.

But infrastructure still poses a problem. Villages like Yuvraj’s continue to be isolated. Road construction to Chandar has progressed only in patches. Three neighbouring villages don’t even have access roads.

The isolation daunts children seeking higher education. Yuvraj’s elder sister, Vaishali, is a Class VI student at the Mangaon zila parishad school. She starts walking from Chandar at 8 am and reaches school by 10.30 am. The nearest high school is in Panshet. “There is just one bus from Mangaon to Panshet at 6 am, for which we need to start walking from here at 3 am, in the dark, over treacherous terrain. And the bus returns only at 9 or 10 pm. A lone student can’t make this trip,” said Anil Sangale, a villager.

2018: problems and solutions

March 30, 2019: The Times of India

(With reports from Debjani Chakraborty in Jharkhand and Minati Singha in Odisha)

The state of school education in India, presumably as in 2018
From: March 30, 2019: The Times of India
Problems and solutions for the betterment of primary education in India
From: March 30, 2019: The Times of India
%age of primary schools in a state with 50 or less students enrolled, presumably in 2019
From: March 30, 2019: The Times of India


'Despite 97% enrolment in schools, drop out rates are high and quality of education poor. Now, Niti Aayog has recommended radical changes in the system for better education...[


1. WHAT AILS SCHOOLS?

Problem:'

India has shortage of more than 10 lakh teachers. Existing ones are poorly distributed.

Solution:

Consolidate schools, transfer teachers from surplus to deficit ones


2. WHAT AILS SCHOOLS?

Problem:

Faulty administrative structure. Understaffed state education bodies

Solution:

Hire skilled people to work with data and tech. Automate systems like academic registers


3. WHAT AILS SCHOOLS?

Problem:

Systemic faults at policy-making levels

Solution:

Build culture of delivery and accountability. Make education budgets flexible


In the decade after the passage of the Right to Education (RTE) Act, while the target of 100% enrolment in primary schools has been largely met, the problem of qualitative improvement in learning has remained. Now, a new study released by the NITI Aayog suggests changes to traditional strategies for improving the quality of school education through a multi-pronged approach.

Despite years of effort and projects on changing syllabuses, teacher training as well as student assessments, the situation has not improved due to structural flaws. “India today suffers from the twin challenges of unviable sub-scale schools and a severe shortage of teachers which makes in-school interventions only marginally fruitful,” says the study co-authored by Alok Kumar, adviser, NITI Aayog, and Seema Bansal, director, social impact, Boston Consulting Group.

Because of an emphasis on enrolment, India adopted the strategy of building schools near every habitation, resulting in a proliferation of schools with tiny populations and inadequate resources. “Today, India has almost 3-4 times the number of schools (15 lakh) than China (nearly 5 lakh) despite a similar population. Nearly 4 lakh schools have less than 50 students each and a maximum of two teachers,” says the report. Around 1.5 crore Indian students study in such unviable schools.

Teacher vacancies have compounded the problem. The country has a shortage of more than 10 lakh teachers. The teachers that do exist are inadequately distributed. “It is not uncommon to find several surplus teachers in an urban school while a single teacher may manage 100-plus students in a rural school. Some states, like Jharkhand, have a severe teacher shortage of more than 40%,” the report maintains. States like Madhya Pradesh, Odisha and Rajasthan are similarly affected.

"Shortage of teachers is a perennial problem in Odisha and is more acute in rural areas. Apart from academic work, existing teachers are also engaged in managing midday meals, conducting surveys and in administrative and election duties,” said Khageswar Pal, a primary school teacher in Mayurbhanj district.

The solutions suggested by the report include consolidating several such schools within a short distance of one another, and providing transport and allowances. “School consolidation, pioneered in states like Rajasthan and Jharkhand, has already reaped rich dividends through improved learning environments and even improved enrolment,” says the report.

The second solution is moving teachers from surplus to deficit schools, restructuring complicated teacher cadres, and increased investment in teacher recruitment through better planning and more stringent processes. Madhya Pradesh has undertaken an online teacher rationalisation process, moving nearly 10,000 teachers from surplus to deficit schools.

The next focus area is learning levels. Annual Status of Education Reports (ASER) found that nearly half of class 5 children cannot read a class 2 text. Dropout rates increase as children go through the school system. “Only around 30% of children enrolling in class 1 graduate from class 12. And of those who do, a majority do not possess the requisite skills to be readily employable,” says the report. Teachers themselves struggle with subject knowledge and the ability to teach it. Also, curriculum lacks relevance, particularly at the secondary level.

One of the solutions for this, say the authors, is moving away from just completing the syllabus to focusing on the competencies students have mastered. “Dedicated time should be carved out in the regular school day to bridge these gaps, and students should be taught based on their learning levels rather than grades. Programmes based on this strategy are being implemented in Haryana, Jharkhand, Madhya Pradesh and Odisha. These states have ensured teachers are provided concrete guidance through scripted handbooks, and students are given workbooks for rigorous practice,” the report says.

The third solution is to rethink vocational education in secondary schools. Currently, nearly 8,000 schools across the country offer one or two trades to vocationalise secondary education. But the trades are outdated.

“There should be need-based customised training of teachers at the grassroots level. A teacher weak in mathematics might be excellent in physics. We tell the students to share their knowledge. We have to do something similar amongst teachers,” said Smith Kumar Sony, currently teaching in two schools in Simdega district of Jharkhand.

The other focus area, said the authors, is in implementation of such strategies. “Communication channels between education directorates and schools are completely broken. There is little data on learning being generated in schools and fed back – so decisions on how to improve education programmes are often educated guesswork,” says the report.

“Core academic institutions— State Councils for Educational Research and Training (SCERTs) and District Institutes of Education and Training (DIETs) — are understaffed and skills like curriculum design or assessment design and analysis are often missing. We need to fill these vacancies with the right people who have the relevant skills. Maharashtra has filled SCERT and DIET vacancies by selecting and training qualified teachers from within the system through a competitive process. They have also instituted a stringent annual performance review mechanism,” says the report. Employees also need to be trained to work with data and technology.

Other changes which could help include automating some systems, such as maintaining academic registers. “In Jharkhand, with real-time school monitoring data now available, the state can identify the bottom 2,500 schools and provide targeted support,” says the report. “We also need to radically rethink the culture of the education department and build one of delivery and accountability. Truly transforming public education will require bold measures like changing the way we manage public finances and making education budgets more flexible. It will need political will and a coming together of the bureaucracy, civil society and private sector.”

The standard of school education in India: 2016-17

Statewise scores on education indicators, 2016-17
From: Oct 11, 2019: The Times of India

See graphic:

Statewise scores on education indicators, 2016-17

2017

ASER: A summary

Dipankar Gupta, If the middle class is stuck in the lift, an aspiring class is running up the stairs, January 27, 2018: The Times of India


The 2017 Annual Status for Education Report (ASER) has pessimism written all over it. It records how teaching standards are slipping fast, and could soon be under the proverbial duck’s tail. Yet, so strong is their aspiration, that the young keep enrolling; even a hopeless school exudes hope.

This is the silver lining in the dark ASER clouds. The percentage of 18 year olds in educational programmes has risen from a mere 32% in the 2001 census to an estimated 70% according to ASER’s 2017 survey. Are parents of these 18 year olds seeing rainbows at night?

This determination to see their young through schools to a better life is worth every sacrifice. Parents willingly tighten their belts past the last notch to afford private schools for their children. Consequently, the percentage of students studying in such establishments remains high and has stayed that way for some time.

Between 2010-11 and 2015-16 student enrollment in government schools across 20 Indian states fell by 13 million, while private schools acquired 17.5 million new students. In all, according to District Information System of Education (or DISE) data, about 35% of children today are in private schools – a huge jump from the 1980s when the number was just 2%.

All of this is not just an urban phenomenon. The ASER findings show that only 1.2% of youth are willing to work in agriculture and that very few young people want to follow their parents’ dreary professions. The jobs most sought after are in the army and police. Education can help in such aspirations because there is an entry test to pass.

Nor are the young satisfied in being herded into vocational schools. They aspire instead, like most middle class people, to be university graduates. Thus while a minuscule 5.3% of those between 14-18 years of age turn to vocational training, 74% aspire for a bachelor’s degree.

Workers in late 19th century Britain also wanted their children to experience the “luxury” of education. They resented the fact that the posh middle class was slotting them into vocational schools as if they were not good enough for universities. This aspirational urge was also a self-respect movement and out of it came several institutions in England such as the University of Reading.

From this a more robust middle class also emerged in Britain. Instinctively, the aspirational class in India seems to be choosing the same route. In fact, ASER records a substantial jump in the number of graduates and predicts their proportion will double in the next decade. Why should the poor be destined to vocational schools? Can they not dream bigger?

Those that still can’t make it refuse to follow their fathers’ footsteps in the mud. Agriculture is hardly an option and that is why they turn instead to non-farm occupations. No wonder, micro and small industries are sprouting more readily on village soil than wheat and rice. According to the MSME Census, there are more such units in rural than in urban India. Squatting over a loom in a windowless room is preferable to pushing a lifeless plough.

Aspirations can be a powerful motivator of knowledge. While their teachers may not deliver at par, schoolchildren are aware of a wider world because that’s where they want to make a life. Once again ASER figures show that as many as 64% could identify the capital of India. Not just that, 79% knew exactly the state they lived in and 42% could even point it out on a map.

These numbers should not be sneezed at for in developed America, according to a Gallup/Harris poll, 73% of Americans could not identify their home country on a map. Not bad at all; the aspiring Indian village kid scores higher than grown Americans.

The aspiring class in our country is running up the stairs while our so-called middle class is stuck in the lift.

ASER: Highlights

ASER centre


This is the twelfth annual report. Every year since 2005, the Annual Status of Education Report (ASER) has reported on children’s schooling status and their ability to do basic reading and arithmetic tasks. Year after year, ASER has highlighted the fact that although almost all children are enrolled in school, many are not acquiring foundational skills like reading and basic arithmetic that can help them progress in school and life. Since 2006, ASER has focused on the age group 5 to 16.

In 2017, ASER focused on an older age group, youth who are 14 to 18 years old and have moved just beyond the elementary school age.

Near-universal enrollment and automatic promotion through the elementary stage have resulted in more and more children successfully completing elementary schooling. According to official figures from the District Information System for Education (DISE), enrollment in Std VIII almost doubled in the decade between 2004-5 and 2014-15, from 11 million to almost 22 million. According to Census 2011, one out of every ten Indians is currently in the age bracket of 14-18. This amounts to more than 100 million or 10 crore youth in all. For all of these reasons, we felt it was important to look closely at this age group of 14 – 18 year olds.

The 2017 ASER report has made an attempt to look ‘beyond basics’ and explore a wider set of domains beyond foundational reading and arithmetic. Four domains were considered – activity, ability, awareness and aspirations. As before, ASER 2017 too is a sample based household survey, with tasks that are simple to administer and easy to understand. Like in previous years, this ASER too has been conducted with the participation of local partner organizations. Since this is the first time that ASER is focusing on this age group, the assessment was carried out in one or two districts in almost all states of our country. ASER 2017 was carried out in a total of 28 districts of 24 states. About 2,000 volunteers from 35 partner institutions, visited more than 25,000 households in 1,641 villages, surveying more than 30,000 14 to 18 year olds in all.

ASER 2017: KEY FINDINGS

ACTIVITY

Overall, 86% of youth in the 14-18 age group are still within the formal education system, either in school or in college.

• More than half of all youth in this age group are enrolled in Std X or below (54%). Another 25% are either in Std XI or XII, and 6% are enrolled in undergraduate and other degree courses. Only 14% are not currently enrolled in any form of formal education.

• The enrollment gap between males and females in the formal education system increases with age. There is hardly any difference between boys’ and girls’ enrollment at age 14; but at age 18, 32% females are not enrolled as compared to 28% males.

• The proportion of youth not enrolled in school or college increases with age. At age 14, the percentage of youth not enrolled is 5%. By age 18, this figure increases to 30%.1

• Overall, about 5% of youth are taking some type of vocational course. This includes those who are enrolled in school or college as well as those who are not currently enrolled.

• Youth who take vocational courses tend to take short duration courses of 6 months or less. Of those who are doing vocational courses, the highest percentage of youth (34%) are enrolled in courses which are 3 months or shorter, and another 25% are enrolled in courses between 4 and 6 months in duration.

• A substantial proportion of youth in the 14-18 age group are working (42%), regardless of whether they are enrolled in formal education or not. Of those who work, 79% work in agriculture – almost all on their own family’s farm. Also, more than three quarters of all youth do household chores daily – 77 % of males and 89% of females.

ABILITY

For the past twelve years, ASER findings have consistently pointed to the fact that many children in elementary school need urgent support for acquiring foundational skills like reading and basic arithmetic. With this year’s focus on an older age group, it is important to understand the level of basic skills among youth as well as their preparedness for tasks that go “Beyond Basics”.

Ability: Foundational skills

First, let us look at the current status of foundational skills for youth in the age group 14 to 18.

• About 25% of this age group still cannot read basic text fluently in their own language.

• More than half struggle with division (3 digit by 1 digit) problems. Only 43% are able to do such problems correctly. The ability to do division – a task that is usually done in ASER, can be thought of as a proxy for the ability to do basic arithmetic operations.

• 53% of all 14 year-olds in the sample can read English sentences. For 18 year-old youth, this figure is closer to 60%. Of those who can read English sentences, 79% can say the meaning of the sentence.

• Even among youth in this age group who have completed eight years of schooling, a significant proportion still lack foundational skills like reading and math.

Interestingly, although reading ability in regional languages and in English seems to improve slightly with age (more 18 year-olds can read than 14 year olds), the same does not seem to apply to math. The proportion of youth who have not acquired basic math skills by age 14 is the same as that of 18 year olds. Learning deficits seen in elementary school in previous years seem to carry forward as young people go from being adolescents to young adults.

Ability: Applying basic literacy and numeracy skills to everyday tasks

People are expected to do many tasks requiring literacy and numeracy every day. Many young people of this age group are the first in their families ever to complete eight years of schooling.2 So, their ability to do basic calculations and make correct decisions is important not just for themselves but for the whole family.

ASER 2017 explored a variety of such tasks with young people in the age group 14 to 18. In terms of daily tasks, we picked some simple activities like counting money, knowing weights and telling time:

• How much money is this? 76% of surveyed youth could count money correctly. For those who have basic arithmetic skills,3 the figure was close to 90%. (This task involves simple addition.)

• 56% could add weights correctly in kilograms. For those who have basic math skills, the figure is 76%. (This task involves addition and conversion from grams to kilograms.)

• Telling time is a common daily activity. For the easy task (hour), 83% got it correct. But for the slightly harder task (hour and minutes) a little less than 60% got it right.

What about common calculations that people often have to do? For ASER 2017, we picked a few such activities like measuring length with a ruler, calculating time, and applying the unitary method (e.g. deciding how many chlorine tablets to use for purifying water).

• 86% of youth could calculate the length of an object if it was placed at the ‘0’ mark on the ruler. But when the object was placed elsewhere on the ruler, only 40% could give the right answer.4

• How many hours has this girl slept? Less than 40% of all sampled youth could calculate the right answer. Of those who could at least do division, about 55% could answer correctly.

• How many tablets are needed to purify water in the big pot? Again about 50% of youth got this right. For those who could do division, the number is 70%.

A variety of tasks in daily life require reading and understanding written instructions. For example, for prevention of dehydration especially in the case of diarrhoea, oral rehydration measures are recommended. ORS packages are available widely in rural and urban areas.

Packages come with easy to use instructions that are quite straightforward. To assess whether youth are able to read and follow simple instructions, we asked them some questions based on this text. For example: how many packets of ORS should be mixed with 2 litres of water? Within how many hours should the prepared mixture be consumed? How many litres of O.R.S. solution can be given to a 21 year-old within a span of 24 hours? Can this packet be used in December 2018?

• In our sample, more than 75% of youth can read a Std II level text fluently. But only a little over half (54%) could answer at least 3 out 4 questions based on the written instructions on the ORS packet.

• Of those who have currently completed 8 years of schooling or are currently enrolled in school or college, about 58% can read and understand instructions. But only 22% of those who are currently not enrolled can do so.

What are some ordinary, commonplace financial calculations? ASER 2017 included four examples:

• Managing a budget: You have Rs. 50 and you are looking at a rate list for snacks. Which three different items can you buy so that fifty rupees is completely spent?

• Taking purchase decisions: In the second task, you need to buy a set of five books. Two different prices are being offered in two different shops. Which shop will you go to if you want to spend the least amount of money possible? And, how much will you spend?

For both the tasks described above, less than two thirds of youth age 14-18 can correctly do the calculations (64%). This figure roughly corresponds to all those who can at least do subtraction in our sample.

• Applying discounts: The third task consists of a picture of a T-shirt which is on sale with a 10% discount. The task is to figure out how much to pay after the discount. 38% of youth can do this computation correctly.

• Calculating repayment: The fourth task is to decide which bank to take a loan from after comparing interest rates being offered by 3 banks and then computing what would be the repayment amount after a year. 71% youth chose the bank correctly but only 22% could calculate the correct repayment amount.56

What about maps and general knowledge? A map of India was shown to each young person who was surveyed. They were asked a series of questions:

• “This is a map of which country?” 86% answered India.

• “What is the name of the capital of the country?” 64% answered correctly.

• “Which state do you live in?” 79% answered correctly.

• “Can you point to your state on the map?” 42% could do so.

The overall patterns indicate that having basic foundational skills like reading and arithmetic are very helpful even for daily tasks and common calculations. However, not everyone who has these foundational skills can correctly complete these everyday tasks. Similarly, although having completed at least 8 years of schooling is an advantage, not all youth who have done so can do these tasks. Females perform worse than males on almost all tasks. These data show that substantial numbers of young people who have completed 8 years of schooling have difficulty applying their literacy and numeracy skills to real world situations.


AWARENESS & ASPIRATIONS

Each sampled youth was asked a series of questions to understand their access to media, financial institutions and the digital world. As expected, mobile phone usage is widespread in the 14-18 age group. 73% of the young people had used a mobile phone within the last week.

• However, significant gender differences are visible. While only 12% of males had never used a mobile phone, this number for females is much higher at 22%.

• Mobile usage rises significantly with age. Among 14 year-olds, 64% had used a mobile phone in the last week. That figure for 18 year-olds is 82%. But for these young people, the use of internet and computers was much lower. 28% had used the internet and 26% had used computers in the last week, while 59% had never used a computer and 64% had never used internet.

• For those who are currently enrolled in the education system, access to internet and computers is higher than those who are not currently enrolled. However mobile usage is high regardless of whether they are enrolled or not.

• Girls and young women have far lower access to computer and internet as compared to boys. While 49% of males have never used the internet, close to 76% of females have never done so.

As expected, almost every young person (85%) had watched television in the last week. 58% had read a newspaper and a little under half (46%) had listened to the radio in the previous seven days. Gender differences in access to traditional media is seen to be far lower than the differences in access to the digital world.

With respect to participation in financial processes and institutions, close to 75% youth have their own bank account. Interestingly, a slightly higher percentage of females have bank accounts than males in this age group. 51% have deposited or withdrawn money from the bank. 16% have used an ATM or debit card, but only 5% have ever done any transaction using a payment app or mobile banking.

ASER 2017 also asked youth about their study and professional aspirations. About 60% youth in the age group 14-18 years wanted to study beyond Std XII. This percentage is almost half (35%) among youth who could not read a Std II level text fluently.

Professional aspirations are clearly gendered, with males aiming to join the army or police or becoming engineers and females showing preference for teaching or nursing careers. Almost a third of the youth who were currently not enrolled in an educational institution did not have a specific occupation that they aspired to. Finally, 40% youth did not have any role models for the profession they aspired to.

Concluding thoughts

Unless we ensure that our young people reach adulthood with the knowledge, skills, and opportunities they need to help themselves, their families, and their communities move forward, India’s much awaited ‘demographic dividend’ will not materialize. Our interactions with youth in this age group suggest that as a country we urgently need to attend to their needs. ASER 2017 is an attempt to shine a spotlight on this situation and hopefully start a nation-wide discussion about the way forward.


2017: National Achievement Survey

Learning levels

Manash Gohain And Atul Thakur , February 24, 2018: The Times of India


Students are learning less as they move to higher classes, a survey of over 1 lakh students in government schools in over 700 districts shows. On average, a class VIII student could barely answer 40% of the questions in maths, science and social studies. The national average score for language was a little better at about 56%.

The findings raise doubts about the demographic dividend India hopes to reap because of a young population. Educationists, experts and rights’ activists are not surprised. They say this is a result of insufficient investment in public education and the government’s inability to implement the Right to Education Act (RTE) in letter and spirit.

The district-wise National Achievement Survey 2017 by National Council of Educational Research and Training (NCERT) tested students in all major subjects in classes III, V and VIII. It used multiple-choice test booklets in maths, language, environmental science, science and social studies. While NCERT is yet to release the national and state-wise data, TOI compiled the district-wise results released so far.

In class III, students averaged between 63% and 67% marks in environmental science, language and maths. In class V, average scores fell by about 10 percentage points to 53-58%, and in class VIII, the fall was even sharper, although language scores dipped only a little. No other subject was common between these classes.

Among regions, the south did better in the early years of schooling. For example, in class III, students in the south scored more than those in the north and the east, and were behind those in the west only in language. In class V, too, they had higher average scores than the rest, but in class VIII, students from the west outperformed all other zones. The south remained ahead of the north, but scored less than the east in science and social studies.

Rural students scored higher than those in cities. Also, in classes V and VIII, OBC students outscored the general category. At all levels, average scores were lowest for ST students while SC students scored a tad higher.

Educationists say such generic surveys are futile if the results are not used to improve teaching. Prof R Govinda, former vice-chancellor of National University of Educational Planning and Administration, said, “The results don’t surprise since basic skills are not being inculcated and cumulatively, the deficit will increase. The results for the last 10 years have been the same, which means we have not done anything. The question is, how can we utilise the study results to improve the teaching-learning process. How are we going to improve teaching in the classroom?”

Ambarish Rai, national convener of RTE Forum, said government has failed to provide adequate funds for school education and implementation of the RTE Act. “RTE is a package for school development. We cannot look at any part of it in isolation.” He said the RTE Act prescribes one teacher for every 30 students at the primary level, and for 35 students in higher classes, but these have not been implemented. The country is short of 10 lakh qualified teachers, he said.

Rai disagrees with those who say that the results are fallout of the no-detention policy, and the Continuous and Comprehensive Evaluation (CCE) process, both of which the Centre removed last year. “The no-detention policy has no role, as it was linked to CCE, which the government failed to implement. CCE is a scientific methodology to assess a child’s performance and explore the possibility of improvement. No detention helped reduce the dropout rate. No research or study in any country shows any relation between detention and learning levels.”

Rai said learning levels will improve when teachers are as per RTE norms. “The teacher training institutes are run by the private sector and government has no mechanism to train teachers. Improving government schools is only possible after complete implementation of RTE and the promised 6% GDP to education.”

Girls outshine boys, rural beats urban

February 24, 2018: The Times of India

The National Achievement Survey 2017 revealed that
Girls outshone boys
Rural stuents beat urban ones
Western India was the best region, and
OBC students did better than ‘general’ students.
From: February 24, 2018: The Times of India

One of the more surprising revelations of the district-wise National Achievement Survey 2017, is that rural students do better than their urban peers.

In class III, urban students outscore their rural counterparts in EVS but score lower in language and mathematics. At higher levels — both classes V and VIII — rural students score better in all subjects except language. Data shows the gap between rural and urban students keeps increasing in higher classes.

It may be because government schools in urban areas are so neglected that parents prefer to send their children to private schools, said Ambarish Rai, national convener, RTE Forum, an NGO. “With crowded classrooms, insufficient number of teachers, and students not getting books and uniforms on time, the government schools are in a pathetic condition.” Rai noted that the results are much better wherever the government invests in its schools. “Kendriya Vidyalayas, where the allocation is eight times higher than in other government schools, are performing better than their private counterparts.”

Girls outperform boys at all levels, but the gap narrows with age. This is probably because in both rural and urban set-ups, girls are additionally burdened with household chores such as helping in the kitchen and taking care of younger siblings.

“Social challenges for girls increase as they grow. This is a major reason why there is also an increase in the dropout rate of girls in higher classes. The Beti Bachao Beti Padhao scheme cannot run on a Rs 200-crore allocation,” Rai added. Girls, however, appear to have a definite advantage over boys in understanding of language. At all levels, the difference in average scores of boys and girls is the highest in language.

7/ 9 worst districts are in UP

Why scoring even 30% is so tough in seven UP districts, February 24, 2018: The Times of India


Of the 700-odd districts in the country, nine have such low standards of school education that students struggle to score 30% marks, and seven of these districts are located in the most populous state, Uttar Pradesh.

The ‘best districts’ in terms of learning outcomes are those where the average score is 80% in class III, 75% in class V, and 70% in class VIII. These are spread across all states, but with a higher concentration in Rajasthan, Karnataka, Kerala and Maharashtra.

The ‘worst’, though, are in UP — Shamli, Ghazipur, Kheri, Varanasi, Maharajganj, Mirzapur and Sambhal, and in Arunachal Pradesh (Changlang) and J&K (Pulwama).

Students here couldn’t score over 30% in at least five of the 10 tests in the NAS (three each for classes III and V, and four for class VIII).

Educationist Ashok Ganguly said UP’s poor showing is mainly due to the prolonged shortage of teachers and lack of activity-based learning in government schools. “There are more than 50,000 schools under the government with a huge shortage of teachers, especially in science and mathematics,” he said. Ganguly was also chairman of Central Board of Secondary Education and director SCERT in UP. “UP students shy away from taking mathematics and science class IX onwards as they have not been taught properly in the lower classes. Wherever we have science teachers, there is no hands-on activity as there are no laboratories. How can you comprehend subjects like science without learning by doing?” he added.

Terming this a systemic failure, Anita Rampal, professor and former dean at the faculty of education, Delhi University, said, “The system thinks anyone can teach. PT teachers are teaching mathematics. In Rajasthan, we have seen how girls have protested to demand teachers for their schools. We need dedicated teachers for subjects from class VI onwards and we need good teachers at the primary level.”

OBCs shine in govt schools

OBCs shine in govt schools, ST students bring up rear, February 24, 2018: The Times of India


The NAS 2017 data shows OBC students — not the general category — perform the best in government and government-aided schools. At the all-India level, OBC students outscored the general category in classes V and VIII, while being slightly behind in class III. SCs were behind both while STs had the lowest average scores.

Significantly, while the gaps are narrow to begin with and narrow further by class VIII, in language the gap widens between social groups as students move to higher classes.

The western region has a different pattern, though. SC students are the best performers in class III, followed by OBC, general and ST students, in that order.

In class V, the gap between the average scores of SC and OBC students gets narrower. In class VIII, OBC students are the highest scorers, followed by SC, ST and general students, respectively.

South is the only region where general students outperform everyone else through all levels and by larger margins in higher classes. Here, too, language remains the subject in which general students have the biggest edge.

In the eastern and northern regions general students score highest in classes III and V, but are overtaken by OBC students in class VIII.

Experts, however, warn against reading too much into these numbers. “Government schools have become the schools of OBC, dalits and minorities. They have fewer students from the general category, whereas schools should have been a place of socialisation of children,” said Ambarish Rai, national convener, RTE Forum.

“OBC and other marginalised children belong mostly to labour class and have different talents. But they don’t have equal opportunity to grow through quality learning. It is the state’s duty to provide them equal opportunity. That is why education was made a fundamental right,” added Rai.

Maths, language skills worsen from class III to class VIII

February 24, 2018: The Times of India


Across the 36 states and UTs, students’ performance in maths and language worsens as they move up from class III to class VIII. Maths is the biggest hurdle of all.

In class III, six states and UTs had average maths scores above 70%; another 17 averaged above 60%, while the remaining 13 scored 40-60%.

In class V, no state had an average score above 70% and just six averaged 60-70%, while Arunachal Pradesh alone finished below 40%. By class VIII, no state or UT averaged even 60% in maths, and 23 averaged below 40%. The minimum drop from class III was 13 percentage points, while in Nagaland, Puducherry, West Bengal and Telangana, the average maths scores fell by more than 30 percentage points.

Language shows a similar pattern. Average scores in class III were above 70% in 12 states and UTs, and between 60% and 70% in another 16. In class V, only Karnataka had an average of over 70% while nine states or UTs averaged between 60% and 70%.

By class VIII, no state averaged 70% or more, and just seven could average over 60%. In Nagaland, Jammu and Kashmir, Telangana and Mizoram, average language scores fell by over 20 percentage points between classes III and VIII.

However, experts questioned the nature of the survey. “This is purely a text-based writing assessment. Sometimes the questions are not comprehensible for students. No other methods were applied to understand their observation and lots of other things children would be doing while learning,” said Anita Rampal, professor and former dean at the faculty of education, Delhi University, who has written several chapters of NCERT’s elementary school textbooks.

“This is such a limited test. We have to first look at the nature of the question, which itself is a challenge,” she said, adding that “children understand things differently. Perhaps they are not familiar with the questions we give them.”

Terming it a ‘limited’ test, educationists said children understand things differently and were perhaps not familiar with the questions set for them

Poor infrastructure

Manash Gohain, Creaking school infra hitting kids’ learning, March 22, 2018: The Times of India


Poor school infrastructure has emerged as a key factor why children are “not learning” in government and government-aided schools across the country.

A state-wise analysis of the National Achievement Survey 2017 for classes III, V and VIII has highlighted that not only do school buildings need significant repair, the learning environment also doesn’t seem to be too conducive for teachers burdened by work overload, lack of drinking water and toilet facilities.

TOI had in one of the most comprehensive analysis of the NAS 2017 on February 24, 2018, highlighted how staff crunch, crowded classrooms and inadequate funds are to blame for poor learning outcomes in government schools as captured in the survey.

The state-wise analysis was finalised by NCERT and submitted to the ministry of human resource development recently, a copy of which is with TOI.

While across states, over 95% students like coming to school — a large number of students find the travel difficult. Lack of electricity at many schools is also one of the major factors highlighted by teachers in the survey.


2018

A summary

Basic literacy, numeracy skills of rural Class VIII students in decline: ASER 2018, January 16, 2019: The Hindu

% of Class V children in govt. schools who can read Class II level text; % of Class VIII children in govt. schools who can read Class II level text
From: Basic literacy, numeracy skills of rural Class VIII students in decline: ASER 2018, January 16, 2019: The Hindu
% of Class V govt. school children who can do division; % of govt. school children in Class VIII who can do division
From: Basic literacy, numeracy skills of rural Class VIII students in decline: ASER 2018, January 16, 2019: The Hindu

What is 919/6? More than half of Class VIII students do not know

While there has been some improvement in the reading and arithmetic skills of lower primary students in rural India over the last decade, the skills of Class VIII students have actually seen a decline.

The Annual Status of Education Report (ASER) 2018, the results of a yearly survey that NGO Pratham has been carrying out since 2006, shows that more than half of Class VIII students cannot correctly solve a numerical division problem and more than a quarter of them cannot read a primary-level text.

Those figures are worse than they were a decade ago. In 2008, 84.8% of Class VIII students could read a text meant for Class II; by 2014, only 74.6% could do so, and by 2018, that percentage had fallen further to 72.8%.

Four years ago, 44.1% of students at Class VIII could correctly divide a three-digit number by a single-digit number; in 2018, that figure had fallen slightly to 43.9%.

Noting that the “additional value added in terms of math skills for each year of schooling is low”, Pratham researchers concluded that “without strong foundational skills, it is difficult for children to cope with what is expected of them in the upper primary grades”.

The picture is slightly more encouraging at the Class III level, where there has been gradual improvement since 2014. However, even in 2018, less than 30% of students in Class III are actually at their grade level, that is, able to read a Class II text and do double-digit subtraction. “This means that a majority of children need immediate help in acquiring foundational skills in literacy and numeracy,” said Pratham.

These overall percentages also camouflage wide differences in skill level between States, or even between students in a single classroom.

For example, the ASER data found that almost half of Class III students in government schools in Himachal Pradesh can read a Class II level text, while another quarter can read a Class I level text. This allows the teacher to use grade-level textbooks for most of the class, although the remaining quarter of students will need ongoing support for basic skills.

In government schools in Uttar Pradesh, however, a quarter of students cannot recognise letters yet, while another 37% can recognise letters, but not read words. Urgent and immediate help is needed for these students if they are not to be left behind.

The ASER survey covered almost 5.5 lakh children between the ages of 3 and 16 in 596 rural districts across the country. In an encouraging trend, it found that enrolment is increasing and the percentage of children under 14 who are out of school is less than 4%. The gender gap is also shrinking, even within the older cohort of 15- and 16-year-olds. Only 13.6% of girls of that age are out of school — the first time the figure has dropped below the 15% mark.

Dropouts: 2006> 18; enrolment: 2010> 18; quality: 2014> 18

School education in India:
Dropout rate: 2006> 18;
school enrolment: 2010> 18;
quality of learning: 2014> 18
From: January 16, 2019: The Times of India

See graphic:

School education in India:
Dropout rate: 2006> 18;
school enrolment: 2010> 18;
quality of learning: 2014> 18

2018: National Achievement Survey

Manash Pratim Gohain, Exams in classes V, VIII to return as no-detention policy ‘fails’ national test, May 28, 2018: The Times of India

HIGHLIGHTS

Government is considering passing requirements for Classes V and VIII from March 2019

NAS found that Class X students were performing worse than Classes III, V and VIII students


The National Achievement Survey (NAS) has delivered a sharp indictment of the ‘no-detention policy’ with learning outcomes deteriorating as students progress to higher classes, prompting the government to consider passing requirements for Classes V and VIII from March 2019. The fresh thinking follows the NAS revealing that Class X students of state boards were struggling to get even 40% of answers right in maths, social science, science and English, doing better only in Indian languages.

Conducted in all states and Union Territories with a sample of 15 lakh students, the NAS, which was carried out on February 5, 2018, found that Class X students were performing worse than Classes III, V and VIII students — evidence of the problem of poor learning being simply moved up the chain to higher classes. If 64% of Class III students of state, CBSE and ICSE boards answered a maths question right, the score was down to less than 40% for all state boards barring Andhra Pradesh for Class X. The NAS for junior classes saw the percentage dipping to 54% in Class V and 42% in Class VIII.

Outcomes for English reflected a similar declining graph. The average of students giving correct answers dipped from 67% in Class III to 58% in Class V and 56% in Class VIII to no state barring Manipur crossing 42% in Class X. “The no-detention policy has not worked. It was conceived in haste and poorly implemented. The government does not want to put students under more stress by compulsory grading in junior classes, but a passing requirement might be needed in Classes V and VIII,” awell-placed source said.

The problem, sources associated with the survey said, was one where the no-detention policy under Right to Education Act saw exams being devalued. “Teachers lost leverage over students and also interest in bothering about outcomes. Students lacked motivation to prepare for exams as there was neither reward nor failure attached to results,” said the source.

The result, as starkly brought out by the NAS, was a growing percentage of underperforming students as they moved to senior classes. The reintroduction of boards at Class Xis likely to deliver a shock in terms of poor pass percentages. Officials pointed to the high number of “failures” in Class XI in recent years as schools’ screen for the Class XII board exams, resulting in protests by students and parents.

Without meaningful evaluations, teachers and school managements are tempted to “kick the can down the road”, even as attempts to enforce exam discipline were met with resistance from students and parents. The no-detention policy, without adequate attention to ensuring learning outcomes, meant that exams were treated in a cavalier manner. It was only in modern Indian languages that state board students in as many as 19 states and UTs crossed the 50% correct-answer mark. This might indicate a higher proficiency in mother tongues. Andhra Pradesh and Rajasthan came across as better performing state boards. Delhi had the highest overall score of 45.6%.

2020

A summary

Anash Gohain, October 29, 2020: The Times of India

The Annual Status of Education Report (ASER 2020) Rural Wave 1
From: Anash Gohain, October 29, 2020: The Times of India

Schools might have been shut, but children continued their learning even during the pandemic. Despite the inequalities and digital divide, the 15th Annual Status of Education Report (ASER 2020) Rural reflected the res ilience shown towards learning as 11% of all rural families bought a new phone since the lockdown began and 80% of those were smartphones. Also more children joined government schools than private schools.

Unlike the previous ASER reports which focussed on learning outcomes, the latest report deals with the process of learning because of the prevailing Covid-19 situation. This is the first time the survey has been conducted over telephone.

While the closure of schools since March 2020 impacted campus academic activities, the good news was that 70% of the community came out to help the school support system. The data demonstrated that almost three quarters of all children receive some for m of lear ning support from family members. Notably, even among children whose parents have not studied beyond primary school, family members provided support with older siblings also playing an important role in helping the younger children learn.

The report called for developing a digital pedagogy and to prioritise efforts to break the digital divide. Just around 56 % households with children enrolled in government schools have smartphones, while 74.2% of households who send their children to private schools have smartphones.

Citing another example of the existing divide, the report said children in private schools were much more likely to have accessed online resources than those in government schools. For example, 28.7% of children enrolled in private schools had watched videos or other pre-recorded content online, as compared to 18.3% of government school students.

Access to learning materials and activities too need attention as only 33.5% of all government school children received materials or activities, as compared to 40.6% children in private schools. In fact, in states like Rajasthan (21.5%), UP (21%), and Bihar (7.7%), less than a quarter of all children had received any materials.

A majority of the roughly two-thirds of all households that reported not having received learning materials during the reference week said they hadn’r received any from the schools. WhatsApp emerged as the most preferred medium via which the children got materials/activities.


2022

ASER report, some brief points, 2018-22
From: January 20, 2023: The Times of India
Government school enrolment, (in %); States with biggest increase in government school enrolment (%), 2018-22
From: January 20, 2023: The Times of India

See graphics:

ASER report, some brief points, 2018-22

Government school enrolment, (in %); States with biggest increase in government school enrolment (%), 2018-22


School enrolment

Manash.Gohain, January 19, 2023: The Times of India

ASER 2022, Some brief points
From: Manash.Gohain, January 19, 2023: The Times of India


New Delhi : Despite school closures during the pandemic, overall enrolment figures have increased from 97. 2% in 2018 to 98. 4% in 2022, recording the highest enrolment for the 6-14 age group, according to the Annual Status of Education Report (ASER) 2022. The annual status of education in rural India also highlighted that now almost onethird of the students from classes I to VIII are now taking paid private tuitions. 
The big turnaround during this period is the rebound of enrolment in government schools. Government school enrolment in this age group had seen a steady decline from 2006 to 2014 to record 64. 9% and remained around that figure till 2018. In 2018 it increased to 65. 6% and thereafter reached 72. 9% in 2022. This is visible in all states/ UTs in the country.


Another improvement marker highlighted in ASER 2022 released on Wednesday is the lowest ever rate for the proportion of girls out of school — down to 2% from 4. 1% in 2018and 10. 3% in 2006. This becomes significant as nationally now a lesser number of girls in the 15 to 16 age group are out of school. Hoevever, MP, UP and Chhattisgarh present causes for concern since they cont inue to have more than 10% of these older age group girls out of schools.


ASER 2022 returned after a gap of four years, reaching 616 rural districts. This y ear’s datacomes after schools reopened afte r prolonged closures due to the Covid pandemic. The latest study surveyed a total of 19,060 villages in rural India, which include 3,74,544 households and 6,99,597 children in the age group 3 to 16.


The repor t also observed that the proportion of government schools with less than 60 students enrolled has increased every year over thelast decade. Nationally, this figur e was 17. 3% in 2010, 24% in 2014, 29. 4% in 2018, and stands at 29. 9% in 2022. The states with the highest proportion of small schools in 2022 include Himachal (81. 4%) and Uttarakhand (74%). However, so me states show a decrease in the fraction of small schools, such as UP (from 10. 4% in 2018 to 7. 9% in 2022) and Kerala (from 24. 1% in 2018 to 16. 2% in 2022).

Reading skills

Manash Gohain, January 19, 2023: The Times of India

ASER report on education- % of children by grade & reading level 2022; % of children by grade and arithmetic level, 2022
From: Manash Gohain, January 19, 2023: The Times of India

New Delhi : The Annual Status of Education Report (ASER) 2022 said the maximum decline in reading abilities was reported in Kerala, Himachal Pradesh and Haryana, among other states, while the drop in arithmetic levels is severe in Tamil Nadu, Mizoram and Haryana.


The percentage of children in Class III in government or private schools who can read at Class II le vel dropped from 27. 3% in 2018 to 20. 5% in 2022. Large drops are also visible in Andhra (from 22. 6% to 10. 3%) and Telangana (from 18. 1% to 5. 2%).


The ASER reading test assessed whether a chi ld can read letters, words, a simpleparagraph at Class I level of difficulty, or a ‘story’ at Class II level of difficulty.


“The percentage of children in Class III in governmen t or private schools who can read at Class II level dropped from 27. 3% in 2018 to 20. 5% in 2022. This decline is visible in every state and for children in both government and private schools,” the repor t stated. States showing a decline of more than 10 percentage points from 2018 levels include those that had higher reading levels in 2018, such as Kerala (from 52. 1% in 2018 to 38. 7% in 2022),

Himachal Pradesh (from 47. 7% to 28. 4%), and Haryana (from 46. 4% to 31. 5%). Large drops are also visible in Andhra Pradesh (from 22. 6% to 10. 3%) and Telangana (from 18. 1% to 5. 2%). “Nationally, the proportion of children enrolled in Class V in government or private schools who can at least read a Class II level text fell from 50. 5% in 2018 to 42. 8% in 2022 . States where this indicator held steady or improved marginally include Bihar, Odisha, Manipur, and Jharkhand.


“States showing a decrease of 15 percentage points or more include Andhra Pradesh (from 59. 7% in 2018 to 36. 3% in 2022), Gujarat (from 53. 8% to 34. 2%), and Himachal (from 76. 9% to 61. 3%).

Enrolment, no. of institutions, gender

Manash Pratim Gohain, January 27, 2024: The Times of India

Higher education in India, 2019-22: Enrolment, no. of institutions, gender
From: Manash Pratim Gohain, January 27, 2024: The Times of India


In a first, more women than men in 5 of 7 top UG courses

Enrolment, No. Of New Edu Institutions Up: Govt Study

Manash.Gohain@timesgroup.com


New Delhi : Higher education in India has witnessed significant progress in terms of enrolment, establishment of new institutions, or improved pupil-teacher ratio in the last five years, with increased participation of females over males in five of the top seven undergraduate programmes across various disciplines for the first time, according to the All India Survey on Higher Education (2021-2022) released by the Centre.

Based on 2011 census, Gross Enrolment Ratio (GER) reached a new high of 28.4, and in both undergraduate and postgraduate levels, there are now more female students on campuses than their male counterparts. In 26 states, GER for females exceeds that for males. There are two UTs registering GERs of over 60%—Chandigarh (64.8) and Puducherry (61.5)—and six states with GERs of 40 and above — Delhi, Tamil Nadu, Himachal Pradesh, Uttarakhand, Kerala, and Telangana.


The total enrolment in higher education has reached 4.33 crore, up from 3.57 crore in 2016-17, an overall growth of 18.1%. According to the survey, enrolment surged by 4.6% from the preceding year and 26.5% from 2014-15. hen it stood at 3.42 crore. The leading six states, which account for 53.3% of total student enrolment and house 51.4% of the total population in the 18-23 age group, are UP (69.73 lakh), Maharashtra (45.78 lakh), Tamil Nadu (33.09 lakh), MP (28 lakh), West Bengal (27.22 lakh) and Rajasthan (26.89 lakh).


Female enrolment has increased to 2.07 crore (a 32% increase since 2014-15 and 18.7% since 2016-17) with states like Kerala, Telangana, Haryana, Assam, Hima chal Pradesh, J&K, Meghalaya and Chhattisgarh having more female students enrolled than males. “The share of female enrollment is 55% of the increase in overall enrollment (91 lakh) since 2014-15,” the report said.


The number of universities/university-level institutions also increased by 341 since 2014-15. In addition to the 45,473 colleges (an increase of 1,677 from 2020-21), there are 1,168 universities, of which 685 are governmentmanaged (Centre: 240, State: 445), 10 private deemed (aided), and 473 private (un-aided). However, 69.8% of total colleges are concentrated in eight states, with Uttar Pradesh (7,182) topping the list, followed by Maharashtra (4,685) and Karnataka (4,283).


The last five years have also witnessed an addition of over 3.12 lakh teachers. This has positively impacted the pupil-teacher ratio (PTR), improving from 30 in 2017-18 to 24 in 2021-22 at university and college levels.


Humanities continue to be the top choice at UG level, with 34.2% of the enrolled students in this stream, followed by BSc and Commerce. BTech is in fourth place with females accounting for only around 30% of the enrolled.
There are a total of 10 UG programmes that account for 90% of enrolment, including BA, BSc, BCom, BTech, BA (Honors), BEd, and medical sciences. With the exception of engineering and commerce, number of females enrolled is significantly higher than males in all others.

2023

Over 90 per cent of students in educational institutions have used social media, 2024
From: [From the archives, January 17, 2024: The Times of India]

See graphic:

Over 90 per cent of students in educational institutions have used social media, 2024

25% rural kids aged 14-18 can’t read Std 2 level in own tongue

43% Can’t Read English Sentences

Manash.Gohain@timesgroup.com
 New Delhi : Nearly 43% of children in the 14-18 age group in rural areas cannot read sentences in English, while 25% struggle to read a Class 2 level text in their respective regional language, shows the Annual Status of Education Report (ASER) 2023.


More than half of the children struggle with even simple division, something they are expected to have mastered in Class 3 or 4.
 The figure on reading English is, in fact, an improvement compared to 2017, when 47% of students were found to be faltering. Of those who could read sentences in English, almost three-fourths could get the meaning (73.5%) compared with 53% in 2017.


The report, published by Pratham Foundation on Wednesday, is based on a survey conducted in 28 districts across 26 states, reaching out to 34,745 children in the 14-18 age group. One rural district was surveyed in each major state with the exception of Uttar Pradesh and Madhya Pradesh, where two such districts were surveyed.


Interestingly, the survey found that 90.5% of the teenagers in this age group said they had used social media in the reference week, with a slightly higher proportion of males (93.4%) than females (87.8%). However it observed that “of all youths who used social media, only about half are familiar with online safety settings that were included in the survey”.


The children were surveyed on four points — basic reading, mathematics and English abilities; application of basic skills to everyday calculations; reading and understanding written instructions; and real-life financial calculations.

Humanities top choice, STEM next

Humanities is the most preferred stream among rural teens in the 14-18 age group, with 55.7% of students opting for these subjects, followed by 31.7% in STEM (science, tech, engg and maths) and 9.4% in commerce. The Annual Status of Education Report said girls (28.1%) were less likely to be enrolled in STEM stream than boys (36.3%).

ASER: Boys do better than girls in everyday calculations

ASER 2023 data from the sampled districts showed that 45% of children in the surveyed group have basic arithmetic proficiency. “The rest need to ‘catch up’. Low levels of foundational numeracy affect the ability of children in tackling everyday calculations where they need to apply measurement or use the unitary method in practical situations, or even do simple financial computations (managing a budget, applying a discount or calculating interest rates or repayment of a loan),” said the report.


On everyday calculations besides reading and understanding written instructions in daily life applications, the survey looked at whether a children can measure length using a scale when the starting point is 0cm and then when the starting point is moved, and whether he/ she can read and understand simple written instructions on ORS packets.


It found that nearly 85% of surveyed children can measure length using a scale when the starting point is 0 cm but this drops sharply to 39% when the starting point is moved. This showed a decline as compared with 2017 when it was 86% and 40%. Boys do better than girls across all everyday calculations.


For nearly two decades, ASER reports have consistently pointed to deficiencies among children in elementary school with regard to foundational skills like reading and basic arithmetic. But this year’s focus on an older age group also points to a similar gap in learning outcomes at higher levels.


ASER reports are usually referred to by the government while formulating policies. The report stated, “Trends on basic learning have remained relatively unchanged over the last decade. Although the National Achievement Survey and ASER use different metrics and methods for assessing learning, both point to the fact that basic learning levels of elementary school children need significant improvement.”


For rural students in 14-18 age group, humanities top choice

Fewer Girls Opt For STEM, Says Report

Annual Status of Education Report (Rural) 2023; Digital awareness and aptitude
From: [From the archives, January 17, 2024: The Times of India]

Manash.Gohain@timesgroup.com


New Delhi : Humanities is the top choice among rural childreninthe age group of 14-18 with 55.7% of students in Class XI or higher in this stream, followed by STEM (31.7%) and commerce (9.4%). Gender-wise girls (28.1%) are less likely to be enrolled in the STEM stream than boys (36.3%), says the Annual Status of Education Report (ASER) 2023 report. 
 The ‘Beyond Basics’ survey was conducted by Pratham in 28 districts across 26 states, reaching a total of 34,745 children in this age group. In 2017, ASER had focussed on the 14-18 age group for the first time. ASER 2023 revisited this category, covering four aspects of the lives of these children — educational and career pathways; ability to apply foundational skills to daily life situations; their digital access and skills; and their aspirations for the future.


The survey found that overall, 86.8% of this group are enrolled in an educational institution, almost same (86%) as in 2017. As per the 2023 report, the percentage of children not enrolled in any form of formal education is 3.9% for 14-year-olds and 32.6% for 18-year-olds. The figures for same in 2017 were 5% and 30% respectively.


The report said while nearly a quarter of boys cited ‘lack of interest’ for discontinuing education, almost 20% of girls attributed it to ‘family constraints’. Other commonly cited reasons are ‘financial constraints’ and ‘failure’ in exams.


The report asserted that the fear that several older students dropped out of school during the Covid-19 pandemic due to loss of livelihood was unfounded.

2024

UNESCO: India tops in primary education, badly in higher classes

Manash Pratim Gohain, July 17, 2024: The Times of India

India in Unesco’s “SDG 4 Scorecard Progress Report on National Benchmarks: Focus on Teachers 2024”
From:

NEW DELHI: India has demonstrated notable progress in primary education, achieving a participation rate of 94% in 2023, just shy of the 99% national benchmark set for 2025, which makes it among the faster-progressing lower-middle-income countries, alongside nations like Vietnam and Iran.

However, at the lower secondary level, India’s progress slows, with a participation rate of 86%, indicating challenges in retaining students beyond primary education.But a more pressing concern is the completion rate at the upper secondary level in India. In the gender equality index, India’s progress in education has been mixed with significant disparities remaining at the upper secondary level. Another big challenge is learning proficiency, a critical indicator of the quality of education and internet connectivity in schools.

This and many more comparative data points were revealed in Unesco’s “SDG 4 Scorecard Progress Report on National Benchmarks: Focus on Teachers 2024” released recently, which reflects both India’s significant achievements and ongoing challenges.

A bigger worry is the completion rate at the upper secondary level. With a current rate of 51%, India lags behind many middle-income countries such as Bangladesh and Indonesia, which have shown faster progress in this area. As per the report, this disparity highlights the need for targeted interventions to support students through to the end of secondary education.

The report provides a detailed analysis of India’s position relative to global benchmarks, with a focus on participation rates, completion rates, gender equality in education, minimum learning proficiency, internet connectivity in schools, and the availability of trained teachers.

For India gender equality in education has been a mixed bag, with the narrowing of gap in primary and lower secondary levels, while there are significant disparities still in play at the upper secondary level. The completion rate for young women in India is improving, but not as rapidly as needed to meet the 2025 benchmark. Comparatively, countries like Bangladesh and Bhutan have made faster strides in closing gender gaps in secondary education.

Minimum learning proficiency, particularly in reading at the end of primary education, is a critical indicator of educational quality. India faces substantial challenges here, with a large portion of the student population not meeting the required proficiency levels. This issue is compounded by data gaps, making it difficult to assess trends accurately. High-income countries like Japan and Finland, by contrast, have almost universal proficiency in reading at the primary level, highlighting a significant area for improvement for India.

The integration of technology in education is another area where India shows potential for growth. The report introduces internet connectivity in primary schools as a new benchmark indicator. While richer countries have nearly universal coverage, India’s progress is still in the nascent stages.

ASER

Abhinaya Harigovind, Uma Vishnu, Jan 29, 2025: The Indian Express


ASER 2024 is based on a rural household survey conducted by Pratham, with 6,49,491 children across 605 rural districts.

The latest Annual Survey of Education Report (ASER) comes bearing some rare good news: an improvement in learning levels across states, led largely by government schools.

For instance, the number of Class 3 children who can read a Class 2 textbook in government schools stands at 23.4%, up from 16.3% in 2022, the year children came back to school after the pandemic years and the resultant shutdowns that led to big learning losses. Across government and private schools, basic arithmetic levels have improved from the pre-pandemic year of 2018 – from 28.1% Class 3 students who could at least do a simple subtraction sum that year to 33.7% now.

The report points out that while almost all states (barring J&K and Nagaland) have shown a recovery in learning levels of Class 3 students when compared to 2022, states such as Haryana, Himachal Pradesh, Uttarakhand, Maharashtra, Odisha and Uttar Pradesh showed a 10-percentage point increase in reading levels in 2024 when compared to 2022.

Other states have also seen big gains when compared to 2018. Bihar saw a jump of almost 8 percentage points in Class 3 reading levels to 20.1% in 2024, while Uttarakhand recorded a sharp rise, from 24.7% in 2018 to 35.6% in 2024. Bihar also saw improvements in Class 3 arithmetic — from 18% in 2018 to 28.2% in 2024.

But the surprise leader of this pack are the government schools of Uttar Pradesh, where reading levels went up 15 percentage points – from 12.3% in 2018 to 27.9%. Overall, across its government and private schools, reading levels went up from 28.3% in 2018 to 34.4% in 2024. The state’s basic arithmetic levels, too, went up, from 26.9% in 2018 to 40.7% in 2024.

While there have been improvements in learning levels across age categories, the gains are the highest in the primary sections, which is the focus of learning initiatives of state governments and the Union Education Ministry’s Nipun Bharat Mission, which focuses on foundational literacy and numeracy (FLN).

While there is still a long way to go in terms of learning levels – the fact that 30% children, across ages, can’t read a Class 2 textbook is a dismal pointer – the gains are significant considering the slump of 2022. When children came back to school that year after two years of the pandemic, almost all states recorded big drops in learning levels, with questions raised about the long-term impact of the slump.


What led to the gains?

What then explains this “sudden improvement in learning levels”, as Wilima Wadhwa, Director, ASER Centre, termed it?

Most signs point to the National Education Policy, 2020, and its focus on foundational skills.

While ASER and other surveys, including the government’s own National Achievement Survey (NAS), have for years pointed to the challenge of poor learning levels across the country, despite rising enrollment levels aided by the Right to Education Act, it was with the NEP that the government for the first time identified foundational learning as the key focus area. According to NEP 2020, “the highest priority of the education system will be to achieve universal foundational literacy and numeracy in primary school by 2025”.

Suman Bhattacharjea, Director, ASER, told The Indian Express, “While ASER has for years been pointing to poor learning levels in the foundational years, it was with NEP that the government threw in its lot, focussing on curriculum changes, teacher training etc. States also put their mind and money into the whole idea.”

Rukmini Banerjee, CEO, Pratham Foundation, said that besides NEP, what helped was that the slump of 2022 came with an opportunity to start afresh. “In 2022, there was a new energy in schools. Children and teachers… everybody wanted to be in school. And everybody said, ‘Kuch to karna chahiye’. The time was right, in some sense.”

Stating that it’s “heartening” to see government schools leading in learning outcomes, Sanjay Kumar, Secretary, Department of School Education and Literacy, Ministry of Education, said, “The COVID-induced learning gap set us back, but we have overcome it… With NIPUN Bharat, there has been focused messaging, along with focused financing for foundational literacy and numeracy (FLN). Assessment has become part of the school education discourse… We have been engaging more with teachers and following up with states on their training. There is also an increasing level of engagement and coordination with states.”

Talking of the gains reflected in the survey, Sridhar Rajagopalan, co-founder of the Bengaluru-based Educational Initiatives, said, “There is no doubt that there has been a certain focus from the government on FLN. Also, there is greater acceptance of FLN now than before. People like us and ASER have been talking about, but for the government to take it up… it has happened post NEP. While it is creditable that some of the Covid losses have been made up for, we have to put it in perspective. Against the poor performance of the last few years, this looks good. But we are still not doing well as, say, Sri Lanka.”

On the need to build on some of these gains, he added, “We need to take external assessment seriously. There is still a lot to be done in terms of support to teachers etc. FLN is not the only thing we need to do. We also need to focus on middle grades, board exam reforms etc. There is a whole menu of things that can be done. If we continue with business as usual, these gains will peter out.”

ASER is a nationwide rural household survey conducted by the NGO Pratham. The latest survey, which comes after the smaller Beyond Basics survey of 2023, assessed 6,49,491 children in 605 rural districts on basic reading levels and arithmetic. The survey considered children in three age categories – pre-primary (ages 3 to 5), elementary (6 to 14), and older children (15 to 16).

The report also shows that government school enrollment, which saw a rise during the pandemic as children moved out of private schools, has almost returned to pre-pandemic levels. The percentage of 6-14-year-olds enrolled in government schools was 65.6% in 2018, rose to 72.9% in 2022, and has now fallen to 66.8%. The overall school enrollment rate among 6-14-year-olds stood at 98.1%, close to the figure of 98.4% in 2022.

2025

2025 UNESCO SDG 4 scorecard

Manash Gohain, July 8, 2025: The Times of India

2025: The UNESCO SDG 4 scorecard for India
From: Manash Gohain, July 8, 2025: The Times of India


New Delhi : India’s education system continues to struggle with critical gaps in foundational literacy and numeracy, teacher training and financing, even as it shows consistent gains in gender parity, school completion rates and digital infrastructure. As per the 2025 Unesco SDG 4 scorecard, the country remains offtrack in upper secondary and tertiary participation, lags behind global spending benchmarks, and has significant shortfalls in training qualified pre-primary teachers, though it has nearly universalised primary and lower secondary education and is improving internet connectivity in schools. 


India’s performance on foundational learning is a key area of concern, with the report saying that countries, including India, are “off track by 11 percentage points” from the benchmark for achieving minimum reading proficiency by the end of primary education. India’s benchmark for this indicator is 56%, but the actual achievement is substantially lower.


In contrast, high-income countries reported reading proficiency levels nearing 99%, while South Asia’s regional average stood at 49%. “The large gap...is likely result of limited experience in setting realistic targets on learning outcomes, which reflects low data availability,” it said. 
Gender parity is one area where India has made notable progress. The report classifies India among countries that have shown “fast progress” in narrowing the gender gap in upper secondary completion. India’s 2025 benchmark reflects a gap of 2.3 percentage points, compared to a regional average of 3.4. “Countries which started with a disadvantage at the expense of girls are moving towards parity,” the report said, adding that India is aligned with this trend.


Upper secondary and tertiary participation remains a serious concern. India’s 2025 benchmark for upper secondary completion is 67%, but the projected out-of-school rate for youth in the 15-17 age group is still 21%. South Asia performs slightly better with a projected 13% out-of-school rate, while high-income countries have nearly achieved universal participation with rates under 2%. The report observed that “already by 2025, it is projected that countries were off track by...six percentage points for upper secondary school age youth”.


India’s public expenditure on education was 3.1% of GDP in 2023, below the SDG benchmark of 4% and far from the National Education Policy’s aspirational target of 6%. This places India below the South Asian average of 3.4% and significantly behind high-income countries, which spend between 4.8% and 5.5% of GDP. The scorecard showed, “Countries are moving backwards in terms of public education spending, which was further away from the twin thresholds of 4% of GDP and 15% of total public expenditure in 2023 than in 2015.” 


India has also not met its target for trained pre-primary teachers. The 2025 benchmark is set at 88%, but progress is slow and data limited. The report said, “Countries are furthest behind from their 2025 national targets in training pre-primary school teachers”, with a global shortfall of seven percentage points.


However, India’s primary and lower secondary completion rates remain strong. The 2025 benchmarks for completion are 92% and 84%, respectively, placing India above the South Asia average of 91% for primary and 88% for lower secondary, though trailing high-income countries where completion is near-universal.


While many low- and lower-middle-income countries struggle with data and implementation, India has submitted benchmarks for net connectivity in schools and is moving forward through programmes aligned with NEP. As 2030 SDG deadline approaches, the report urged countries to accelerate action.

See also

Education in India: Annual Reports on the State of Education

Education: India (covers issues common to all categories of Education) <> Education: India, 1911 <> Engineering education: India <> Education, annual reports on the status of: India<> Higher Education, India: 1 <> Medical education and research: India <> Primary Education: India <> School education: India (covers issues common to Primary and Secondary Education) <> Secondary Education: India <> Indian universities: global ranking <> Caste-based reservations, India (history) …and many more.

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox
Translate